BIM Architectural Modelling — Commercial High-Rise Project
Project Timeline: March 2024 – April 2025
Al Sadaat Consolidate delivered a complete and highly detailed BIM architectural modelling package for this multi-storey commercial high-rise project, covering full 3D Revit building modelling, interior space planning, and comprehensive floor plan documentation. Our team produced accurate, construction-ready BIM models with precise architectural detailing across all floors — from ground level reception and workstation halls to rooftop glazed office spaces and MEP coordination zones.Key Project Highlights:
🏢 Full 3D Revit exterior BIM model of a multi-storey commercial building with glazed curtain wall facade, rooftop structures, and podium level detailing
🪟 Detailed isometric 3D view showing complete interior floor layouts, structural grid lines, and level-by-level architectural coordination
🖥️ 3D interior office space modelling including workstation clusters, office chairs, storage units, partitions and furniture layout coordination
📐 Detailed multi-zone commercial floor plan covering reception lobby, workstation halls, elevator lobby, GM office, meeting rooms, toilets, cargo lift, AHU room, electrical room and staircase layouts
🔵 Full structural grid coordination with precise column grid references across all plan views
✅ IFC-compliant, authority-ready BIM models delivered to LOD standards for seamless construction and approval submission